Showing posts with label ACT 250. Show all posts
Showing posts with label ACT 250. Show all posts

Friday, January 16, 2015

New Procedure and release of Statewide River Corridor Data!

It seems a little late into January to be saying this, but Happy New Year to all.  Last month, we had 2 big releases for Vermont Floodplain and River Corridor management:

In the beginning of December, we released our new Flood Hazard Area and River Corridor Protection Procedure which was a while in the making.  This new procedure has several purposes, but the main purpose is to document how the DEC (Department of Environmental Conservation) defines and maps river corridors for: the purpose of Act 250 & Section 248 proceedings, administering the state Flood Hazard Area and River Corridor Rule, and for the regulation of berming under the Stream Alteration rules.

As for the second big release, we are happy to announce the release of our Statewide River Corridor data online!  As you see in the purpose of the Procedure, VT Rivers Program has updated the methodology for mapping River Corridors. This change has come mostly because we have been working very hard over the past year and a half or so to create a statewide river corridor map that covers all Vermont streams with a drainage area of greater than 2 square miles.  At the end of last year, the first Statewide River Corridor map was released to the public for use and can be accessed on the VT ANR Natural Resource Atlas or at the Flood Ready Atlas.  At this time, the statewide map is an approximate river corridor map but we will be working to incorporate the many miles of field assessed data that has been collected throughout the state over the past many years.  Please refer to the River Corridors - Frequently Asked Questions page, as some of your question may be addressed there.

Something else that is new and on the horizon is the implementation of our Flood Hazard Area and River Corridor Rule.  The Rule was adopted this past fall and will go into effect on March 1, 2015.  We will be posting more information in the coming weeks about this roll out.  If you read the rule and our new procedure, you will see that the Procedure contains the background and technical information that support the new rule.

Please be aware that our new rule will apply only to development that is exempt from local municipal permitting, specifically:

  • State owned and operated facilities and properties;
  • farms and silvicultural properties that operate under the Accepted Agricultural Practices (AAPs) or Accepted Management Practices (AMPs which apply to protecting water quality on logging jobs); and
  • power-generating facilities or transmission facilities subject to Section 248 jurisdiction 
A public notice to announce the draft General Permit for the FHARC Rule is anticipated in the coming weeks.

Monday, October 6, 2014

Draft DEC Flood Hazard Area and River Corridor Protection Procedure - Comments Invited through Nov. 3

By the Department of Environmental Conservation
October 6, 2014
The Vermont General Assembly passed Act 138 in 2012 requiring the Agency of Natural Resources (ANR) to adopt a Procedure that will:
Outline methods for assessing the sensitivity (i.e., stability) of rivers in the state; delineating river corridors based on sensitivity; and identifying where flood and fluvial erosion hazards pose a probable risk of harm to life, property, or public infrastructure;
Aid and support the municipal adoption of river corridor, floodplain, and buffer bylaws; and
Recommend best management practices for river corridors, floodplains, and buffers.

Acts 138 and Act 107 also required the State to adopt a Flood Hazard Area and River Corridor Rule with the authority to set standards in exceedance of the minimum regulatory standards required by the National Flood Insurance Program administered by FEMA. The Administrative Rule will apply to activities exempt from municipal regulation, i.e., state building and transportation projects, public utilities, and agricultural and silvicultural activities. The proposed Rule would establish a “no adverse impact” (NAI) standard, which essentially limits proposed state facilities or utilities from making any change in the height or velocity of floodwater that would increase inundation or erosion hazards.
The draft Flood Hazard Area and River Corridor Protection Procedure (attached) explains how the Department of Environmental Conservation (DEC) will utilize the same “no adverse impact” standard in providing technical assistance and regulatory recommendations to municipalities, Act 250, and other regulatory agencies. While NAI is the standard ANR has applied since 2004 in making Act 250 recommendations and under Criterion 1D for the NFIP floodway and the ANR river corridor1, it is a higher standard to be met in the flood hazard area outside of the NFIP floodway recommending measures of compensatory storage when necessary.

The Procedures also explain how:
a) Flood hazard areas, river corridor, and Act 250 floodways are delineated;
b) Flood hazard area and river corridor maps are amended or revised by the Department and other parties;
c) Waivers from the NAI standard are used to encourage land use planning for infill, redevelopment, and the shadowing of other structures; and
d) Best practices may be used to promote stream and floodplain equilibrium conditions and the natural attenuation of flood sediments, heights, and velocities that influence flood inundation and fluvial erosion.
The River Corridor and Floodplain Protection Program will accept public comments until November 3, 2014. Written comments should be addressed to ANR.WSMDRivers@state.vt.us or DEC Rivers Program, Watershed Management Division, 1 National Life Drive, Main 2, Montpelier, VT 05620-3522


1 ANR River Corridors are calculated and field-measured areas providing for the stream dynamics, meanders, and the riparian buffers necessary for the restoration and protection of naturally stable or least erosive river forms. Corridors show an area where any stream channelization measures used to protect development or other improvements contribute to an increase in fluvial erosion upstream and downstream and adversely affect public safety, riparian landowners, and river ecosystems.